Manufacturing Solar in Adelaide

Cut daytime machinery costs. Systems up to 1 MW now earn STCs.

Factories and engineering workshops use most of their power in daylight, running compressors, CNC machines, welders and extraction on weekday shifts. Energy Buster designs commercial solar around that load, the roof and the switchboard, and checks the rest of the bill while we’re there.

  • NETCC Approved Seller
  • Installations completed by SAA-accredited installers
  • Smart Energy Council member
  • 30-year warranty on SunPower MAX panels
33%
lower quarterly power bill at A1 Anco Engineering, Athol Park with 15 kW of solar, LED, power factor correction and a tariff review (estimate). Read the case study

Request a Manufacturing Solar Assessment

Tell us about the site, your operating hours and your current bill. We’ll use it as the starting point for the assessment.

Solar for Manufacturing Sites: The Short Answer

Manufacturing projects delivered by our engineering team range from 15 kW to 100 kW, sized to weekday daytime load rather than roof area. Across six of those projects, estimated paybacks range from 3.1 to 4.0 years, often as part of a package with LED lighting and power factor correction. What differs for factories: three-phase machinery loads, demand charges and older roof structures. Systems up to 1 MW now earn STCs, so larger sites can size past 100 kW.

Why Manufacturing Sites Suit Solar

A factory’s load profile is one of the best matches for solar generation. The details still need checking site by site.

Production Runs in Daylight

Day shifts line up with solar generation, so a well-sized system is used on site instead of exported at a low feed-in rate. Sites with compressors, extraction or refrigeration running all day use even more of it.

Large, Low-Pitched Metal Roofs

Industrial buildings in areas like Athol Park, Royal Park and Wingfield usually have broad metal roofs with few obstructions. Older roofs need their sheeting, purlins and fixings checked before a large array goes on.

Three-Phase Machinery and Power Factor

Motors, welders and compressors draw heavily on three-phase supply and often cause poor power factor, which can push up network charges. Solar doesn’t fix that on its own, which is why A1 Anco Engineering’s solution added two 50 kVAr power factor correction units alongside the solar.

Energy Charges vs Demand Charges

Solar cuts the energy you buy in daylight. It can’t be relied on to lower a demand charge set by a machinery start-up on a cloudy morning. We read both sides of the bill before recommending a system size, and treat tariff review as part of the job.

Case Study: A1 Anco Engineering, Athol Park

Solar panels on the A1 Anco Engineering factory roof in Athol Park

A1 Anco Engineering is an Australian-owned machining and manufacturing business with more than 30 years’ experience, supplying customers in Adelaide and overseas.

Energy Buster delivered a four-part solution across the site’s two electricity meters: a 15 kW solar system, an LED lighting upgrade, two 50 kVAr power factor correction units and a tariff review. Handling both meters together meant a tariff change on one meter didn’t dilute the savings.

The Results (Estimates)

Solar system 15 kW (with LED, power factor correction and tariff review)
Quarterly bill before $72,132
Quarterly bill after $48,648
Quarterly saving $23,484 (33%)
Estimated payback 3.3 years
Estimated ROI 30%

Savings are for the whole solution, not solar alone.

Commercial Solar Incentives Now

STCs Now Cover Systems up to 1 MW

From 1 October 2026, the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, up from 100 kW. Systems in that range now earn STCs instead of relying only on certificates earned over time.

When Claims Open

The Clean Energy Regulator expects applications for systems above 100 kW to open in mid to late November 2026. Eligible systems installed on or after 1 October 2026 can apply once they open. The STC value depends on system size, location and installation date. Source: Clean Energy Regulator.

Tax Treatment

How a solar system is treated for tax depends on your structure and the rules in force when it’s installed. Talk to your accountant before you commit.

For manufacturers: sites that were previously held to 100 kW to stay inside the scheme can now size to their actual daytime load, up to 1 MW, and still earn STCs.

Manufacturing Solar Sizes From Real Projects

These are South Australian manufacturing projects delivered by Energy Buster and our sister company Sustainable Savings, which shares the same engineering team. They show the range of system sizes, not fixed packages.

Project Business System Est. payback
A1 Anco Engineering, Athol Park Machining and engineering 15 kW, plus LED and power factor correction 3.3 years
HR Products, Royal Park Irrigation equipment manufacturer 60 kW in two 30 kW stages, plus LED 3.2 years
Minijumbuk, Naracoorte Wool bedding manufacturer 78.5 kW, plus LED 3.6 years
Haircare Australia, Marleston Hair care manufacturer and distributor 100 kW, solar only 3.1 years
Quality Always, Dry Creek Wool textile manufacturer 100 kW, plus LED 3.4 years
Quality Plastics & Tooling, Wingfield Plastic components manufacturer 100 kW 4.0 years

Paybacks are the published estimates for each whole project, and several projects include work beyond solar. Your payback depends on your daytime load, tariff, roof and the equipment selected. For sizing references, see our 30 kW, 50 kW and 100 kW system pages. For larger projects and the full range of sizes we have delivered, see our commercial solar system sizes.

Design, Approvals and Installation

Roof and Structure

We check roof sheeting, purlins, fixings, corrosion and shading. On large or older roofs, a structural engineer confirms the load before the design is final.

Three-Phase Supply and Switchboard

Commercial systems connect to three-phase supply at the main switchboard. We check its capacity, protection and space for new equipment, and include any upgrade in the proposal.

Network Connection and Export Limits

Systems above 30 kVA on a low-voltage connection must meet SA Power Networks’ TS132 technical standard and go through its approval process. Export limits may apply, and we design around them.

Installing Without Stopping Work

Rooftop work happens while the site operates. The switchboard connection needs a short planned shutdown, which we schedule around your operating hours.

Battery Option

Where evening load, export limits or backup needs make storage worth considering, we model a battery separately so you can see whether it pays its way.

Monitoring

Every system is handed over with monitoring, so you can compare generation and site consumption and spot a fault early.

For manufacturers: tell us about shift patterns, planned shutdowns and any new machinery on the way. We time the switchboard work around production and size the system for the load you’ll have, not just the load you have today.

Why Choose Energy Buster Panels

Supply Chain You Can Check

Every proposal names the exact panel and inverter models, so your procurement team can check where they come from. We also publish our Modern Day Slavery Statement.

One Set of Warranty Terms

SunPower MAX panels carry a 30-year warranty. The terms are set out in writing in your proposal, so you know what’s covered before you sign. Compare our full solar panel range.

Data Sheets Up Front

Manufacturer data sheets and warranty documents for the panels, inverters and mounting systems we use are on our data sheets page, ready for your engineers and insurers.

Modern Slavery Reporting

Businesses with annual consolidated revenue of $100 million or more must report on modern slavery risks in their supply chains under the Modern Slavery Act 2018 (Cth). Named, documented equipment makes that reporting easier for larger organisations and their customers.

From Bill Review to Switch-On

1. Bill and Data Review

We review your bills and, where available, interval data from your meter.

2. Site Assessment

Roof, structure, shading, access and switchboard inspection.

3. Design and Proposal

System layout, equipment, savings modelling and a written proposal.

4. Network Approval

Connection application to SA Power Networks.

5. Equipment and Scheduling

Equipment ordered, and installation dates set around your operations.

6. Installation

Mounting, panels, inverters and cabling while the site keeps operating.

7. Connection and Commissioning

Planned switchboard shutdown, testing and switch-on.

8. Handover and STCs

Monitoring set-up, documentation and STC paperwork.

Ways to Pay for Commercial Solar

How you pay for a system changes who owns it, how it’s treated for tax and how quickly you see the saving. The common options are:

Upfront Purchase

You own the system from day one and keep all of the savings. The full cost is paid at installation.

Loan or Equipment Finance

Repayments spread the cost over a set term, and the bill savings can offset them. You own the system.

Solar Lease

A provider owns the system and you pay a regular fee to use it. What happens at the end of the term varies by agreement.

Power Purchase Agreement

A provider installs and owns the system and sells you the power at an agreed rate. PPAs usually suit larger sites and longer terms.

Each option has different tax, ownership and cash-flow implications. Talk to your accountant or financier about what suits your organisation.

More Manufacturing Proof

HR Products, Royal Park

HR Products manufactures, imports and distributes automatic irrigation equipment and has been in business since 1979. Energy Buster installed a 30 kW solar system and an LED upgrade in 2014, then added a second 30 kW system in 2019 with a tariff approach that protected the savings.

Quarterly bill: $3,040 before, $519 after
Quarterly saving: $2,521 (83%)
Estimated payback: 3.2 years
Estimates, for the whole solution.

Auto Service Centre, Salisbury

This Salisbury site combines car servicing, crash repair, parts and an engineering workshop. Other installers had found the solar install too complicated. Energy Buster installed a 35 kW system, embedded the whole site to improve its buying rate and brought the main switchboard up to compliance.

Quarterly saving: $1,403 (51%)
Estimated payback: 3.1 years
Estimates, for the whole solution.

“For a couple of years I had several companies look at putting a solar system into my premises, but nobody could solve the problem. The engineers at Energy Buster solved it.”
Jeff Digance, Auto Service Centre (watch the video)

Read independent customer reviews of Energy Buster on SolarQuotes, or browse all case studies.

Solar for other industries: food processing solar · supermarket solar · all commercial solar in Adelaide

Manufacturing Solar FAQs

Often, but it has to be checked first. We look at the roof sheeting, purlins, fixings and corrosion, and where the system is large or the roof is old, a structural engineer confirms the load. Asbestos cement roofs can’t simply be drilled and fitted with panels, so they usually need replacing or a different mounting location. If part of the roof isn’t suitable, the design works around it rather than forcing the full system on.

It depends on how much power the site uses during daylight on working days, not on how much roof is available. Manufacturing projects delivered by our engineering team range from 15 kW to 100 kW. We size from your bills and, where available, interval data from your meter, so most of the generation is used on site instead of being exported.

Yes. From 1 October 2026 the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, so systems up to 1 MW now earn STCs. The Clean Energy Regulator expects applications for these larger systems to open in mid to late November 2026. The value depends on system size, location and installation date.

Not reliably. Solar reduces the energy you buy during daylight, but a demand charge is set by your highest load, which can land on a cloudy day or after sunset. That is why our manufacturing solutions often pair solar with power factor correction and a tariff review, which target the demand side of the bill directly.

Yes. Panels and inverters are installed while the site keeps running. The only interruption is a planned shutdown at the main switchboard to connect the system, which we schedule around your production, such as before a shift or on a weekend.

Not usually as a starting point. Most factories use their solar as it is generated, so there is little left over to store. A battery is worth assessing when the site runs evening shifts, has export limits or wants backup for critical loads. We model it separately so you can see whether it pays its way.

It is exported to the grid, usually at a much lower value than the power you buy, and export limits may apply on your connection. This is why we size systems to weekday daytime load. If you run weekend shifts or continuous processes such as compressors or refrigeration, more of that generation is used on site.

Send Us a Quarterly Bill for a Manufacturing Bill Check

Send us a recent quarterly bill and we’ll look at the parts that matter for a factory:

  • How much of your energy is used in daylight on working days
  • Demand charges and power factor
  • Whether your tariff still suits how the site operates
  • A solar size range matched to that load

Prefer to talk? Call (08) 7120 6377.