Hotel and Hospitality Solar in South Australia

Cut the cost of kitchens, cool rooms and long trading hours.

Hotels, pubs and clubs run kitchens, cool rooms, bottle shop refrigeration, air-conditioning, laundry and lighting for long hours, seven days a week. Energy Buster designs solar around that load and works on the rest of the bill, from refrigeration compressors to tariffs.

  • NETCC Approved Seller
  • Installations completed by SAA-accredited installers
  • Smart Energy Council member
  • 30-year warranty on SunPower MAX panels
53%
lower quarterly power bill at Thaxted Park Golf Club with 30 kW of solar on the clubhouse, pump VSDs and LED (estimate). Read the case study

Request a Hospitality Solar Assessment

Tell us about the venue, your trading hours and your current bill. We’ll use it as the starting point for the assessment.

Solar for Hotels and Clubs: The Short Answer

Hospitality projects delivered by our engineering team range from 30 kW on a golf clubhouse to 130 kW across a Riverland hotel and its bottle shop, with estimated paybacks of 3.7 to 4 years. Venues trade seven days, so weekend generation is used. What differs for hospitality: refrigeration and kitchen loads, evening peaks after sunset, and several buildings on one site. Systems up to 1 MW now earn STCs.

Why Hospitality Venues Suit Solar

Hospitality venues use power every day of the week. The challenge is that some of the busiest hours fall after sunset.

Seven-Day Trading

Venues that trade every day use their weekend generation instead of exporting it, so more of the output turns into bill savings.

Cool Rooms and Bottle Shops

Cool rooms, bar fridges and bottle shop refrigeration run around the clock. At the Renmark Hotel, variable speed drives on the refrigeration compressors were part of the solution alongside solar.

Evening Peaks After Sunset

Dinner service and functions peak after the sun goes down. Solar covers the daytime load: kitchen prep, laundry, air-con and lunch trade. A battery is worth modelling for the evening.

Several Buildings on One Site

Hotels often have a main building, bottle shop, accommodation and function space. The Renmark Hotel has 100 kW on the main hotel and a separate 30 kW system on the bottle shop.

Case Study: Renmark Hotel, Renmark

Solar panels on the Renmark Hotel roof

The Renmark Hotel sits on a bend of the Murray River and has been community owned since 1897, offering accommodation, dining, entertainment and a function centre.

After a major renovation, the hotel wanted to look at efficiency and alternative energy. Our sister company Sustainable Savings carried out a comprehensive engineering audit and deployed a broad solution: LED lighting, voltage optimisation, variable speed drives on the refrigeration compressors, a tariff review, 100 kW of solar on the main hotel and 30 kW on the bottle shop.

The Results (Estimates)

Solar system 100 kW on the hotel + 30 kW on the bottle shop
Also included LED, voltage optimisation, compressor VSDs and tariff review
Bill saving 28%
Estimated payback 4 years
Estimated ROI 25%

Estimates for the whole solution, not solar alone.

Commercial Solar Incentives Now

STCs Now Cover Systems up to 1 MW

From 1 October 2026, the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, up from 100 kW. Systems in that range now earn STCs instead of relying only on certificates earned over time.

When Claims Open

The Clean Energy Regulator expects applications for systems above 100 kW to open in mid to late November 2026. Eligible systems installed on or after 1 October 2026 can apply once they open. The STC value depends on system size, location and installation date. Source: Clean Energy Regulator.

Tax Treatment

How a solar system is treated for tax depends on your structure and the rules in force when it’s installed. Talk to your accountant before you commit.

For hotels and clubs: larger hotels and venue groups can now size a single system up to 1 MW and still earn STCs.

Hospitality Solar Sizes From Real Projects

These are South Australian hospitality projects delivered by Energy Buster and our sister company Sustainable Savings, which shares the same engineering team. They show the range of system sizes, not fixed packages.

Project Business System Est. payback
Thaxted Park Golf Club, Woodcroft Golf club and clubhouse 30 kW, plus irrigation pump VSDs and LED 3.7 years
Renmark Hotel, Renmark Hotel, accommodation and bottle shop 100 kW + 30 kW, plus compressor VSDs, voltage optimisation and LED 4 years

Paybacks are the published estimates for each whole project. Your payback depends on trading hours, refrigeration and kitchen load, tariff, roof and the equipment selected. For sizing references, see our 30 kW and 100 kW system pages. For other industries, see our commercial solar options for Adelaide businesses.

Design, Approvals and Installation

Roof and Structure

We check roof sheeting, purlins, fixings, corrosion and shading. On large or older roofs, a structural engineer confirms the load before the design is final.

Three-Phase Supply and Switchboard

Commercial systems connect to three-phase supply at the main switchboard. We check its capacity, protection and space for new equipment, and include any upgrade in the proposal.

Network Connection and Export Limits

Systems above 30 kVA on a low-voltage connection must meet SA Power Networks’ TS132 technical standard and go through its approval process. Export limits may apply, and we design around them.

Installing Without Stopping Work

Rooftop work happens while the site operates. The switchboard connection needs a short planned shutdown, which we schedule around your operating hours.

Battery Option

Where evening load, export limits or backup needs make storage worth considering, we model a battery separately so you can see whether it pays its way.

Monitoring

Every system is handed over with monitoring, so you can compare generation and site consumption and spot a fault early.

For hotels and clubs: tell us about trading hours, functions, accommodation and every building on the site. We schedule the switchboard shutdown in the quietest window, so cool rooms and the kitchen are back on before service.

Why Choose Energy Buster Panels

Supply Chain You Can Check

Every proposal names the exact panel and inverter models, so your procurement team can check where they come from. We also publish our Modern Day Slavery Statement.

One Set of Warranty Terms

SunPower MAX panels carry a 30-year warranty. The terms are set out in writing in your proposal, so you know what’s covered before you sign. Compare our full solar panel range.

Data Sheets Up Front

Manufacturer data sheets and warranty documents for the panels, inverters and mounting systems we use are on our data sheets page, ready for your engineers and insurers.

Modern Slavery Reporting

Businesses with annual consolidated revenue of $100 million or more must report on modern slavery risks in their supply chains under the Modern Slavery Act 2018 (Cth). Named, documented equipment makes that reporting easier for larger organisations and their customers.

From Bill Review to Switch-On

1. Bill and Data Review

We review your bills and, where available, interval data from your meter.

2. Site Assessment

Roof, structure, shading, access and switchboard inspection.

3. Design and Proposal

System layout, equipment, savings modelling and a written proposal.

4. Network Approval

Connection application to SA Power Networks.

5. Equipment and Scheduling

Equipment ordered, and installation dates set around your operations.

6. Installation

Mounting, panels, inverters and cabling while the site keeps operating.

7. Connection and Commissioning

Planned switchboard shutdown, testing and switch-on.

8. Handover and STCs

Monitoring set-up, documentation and STC paperwork.

Ways to Pay for Commercial Solar

How you pay for a system changes who owns it, how it’s treated for tax and how quickly you see the saving. The common options are:

Upfront Purchase

You own the system from day one and keep all of the savings. The full cost is paid at installation.

Loan or Equipment Finance

Repayments spread the cost over a set term, and the bill savings can offset them. You own the system.

Solar Lease

A provider owns the system and you pay a regular fee to use it. What happens at the end of the term varies by agreement.

Power Purchase Agreement

A provider installs and owns the system and sells you the power at an agreed rate. PPAs usually suit larger sites and longer terms.

Each option has different tax, ownership and cash-flow implications. Talk to your accountant or financier about what suits your organisation.

More Hospitality Proof

Thaxted Park Golf Club, Woodcroft

After a comprehensive engineering audit, Energy Buster fitted variable speed drives to the club’s two main irrigation pumps, installed 30 kW of solar on the clubhouse, upgraded the lighting to LED and reviewed the tariff.

Quarterly bill: $4,103 before, $1,924 after
Quarterly saving: $2,179 (53%)
Estimated payback: 3.7 years
Estimates, for the whole solution.

“Energy prices were getting unmanageable. Energy Buster looked at everything at the same time, right throughout the business.”
Adam Hays, Thaxted Park Golf Club (watch the video)

Cool Rooms and Kitchens

Hospitality refrigeration works like a supermarket’s: always on, and hardest on hot afternoons. See how Westside IGA in Murray Bridge cut its quarterly bill by an estimated 49% with solar and refrigeration optimisation.

Read independent customer reviews of Energy Buster on SolarQuotes, or browse all case studies.

Solar for other industries: winery solar · supermarket solar · all commercial solar in Adelaide

Hotel and Hospitality Solar FAQs

Usually, yes. Venues still use plenty of daytime power for cool rooms, kitchen prep, laundry, air-con and lunch trade. Solar covers that, and a battery can be modelled separately to see whether shifting some generation into the evening pays its way.

Yes. Each building can have its own system sized to its load. The Renmark Hotel has 100 kW on the main hotel and a separate 30 kW system on the bottle shop.

It depends on daytime load and roof area. Hospitality projects delivered by our engineering team range from 30 kW on a golf clubhouse to 130 kW across a hotel and bottle shop. We size from your bills so most of the generation is used on site.

It is worth looking at both. Variable speed drives on refrigeration compressors were part of the Renmark Hotel solution, reducing how much power the cool rooms needed before solar was sized.

Yes. Rooftop work is scheduled around guests and service, with access kept away from public areas. The switchboard connection needs a short planned shutdown, which we schedule in your quietest window.

Yes. From 1 October 2026 the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, so systems up to 1 MW now earn STCs. The Clean Energy Regulator expects applications for these larger systems to open in mid to late November 2026.

Yes. The Renmark Hotel is in the Riverland, and our engineering team has delivered projects across regional South Australia.

Send Us a Quarterly Bill for a Hospitality Bill Check

Send us a recent quarterly bill and we’ll look at the parts that matter for a venue:

  • How your load splits between daytime and evening trade
  • Refrigeration, kitchen and air-con load
  • Every building and meter on the site
  • A solar size range matched to your trading pattern

Prefer to talk? Call (08) 7120 6377.