School Solar in Adelaide

Lower running costs, staged to fit the school budget.

Schools run classrooms, air-conditioning, lighting, IT and trade workshops through the school day, then sit quiet over the holidays. Energy Buster designs solar around that pattern and can stage a project across budget years, as we did at St Paul’s College.

  • NETCC Approved Seller
  • Installations completed by SAA-accredited installers
  • Smart Energy Council member
  • 30-year warranty on SunPower MAX panels
84%
lower power bill at St Paul’s College, Gilles Plains after three stages of solar, power factor correction and LED (estimate). Read the case study

Request a School Solar Assessment

Tell us about the campus, your buildings and your current bill. We’ll use it as the starting point for the assessment.

Solar for Schools: The Short Answer

St Paul’s College in Gilles Plains reached 194 kW of solar over three stages, sized each time to its remaining daytime load, and cut its power bill by an estimated 84% with an estimated 4.2-year payback. What differs for schools: holiday periods when generation is exported, staged budgets, multiple buildings and trade workshops. Systems up to 1 MW now earn STCs, so large campuses can size past 100 kW.

What Makes Schools Different

Schools use a lot of power during the day, but only during term. The design has to account for both.

Daytime Load During Term

Classrooms, air-conditioning, lighting, IT and specialist rooms run through the school day, so solar generation is used on site during term.

Holidays Change the Numbers

Over the summer holidays, when solar output is at its highest, most of the campus is empty and generation is exported. Sizing to term-time load, and getting full value for exports, protects the payback.

Staged Budgets

School capital budgets rarely cover everything at once. St Paul’s College built its system in three stages over several years, adding solar as budget and daytime load allowed.

Multiple Buildings and Workshops

Campuses spread across several buildings, often with trade training workshops and older switchboards. We assess the whole campus and connect where it makes the most sense.

Case Study: St Paul’s College, Gilles Plains

St Paul's College campus in Gilles Plains

St Paul’s College is a Catholic school for boys in the Edmund Rice tradition, offering academic and vocational pathways and a specialist trade training centre. The college wanted greater control of energy costs and a better sustainability footprint.

Our sister company Sustainable Savings carried out an engineering energy study and delivered the solution in three stages. Stage one: a 24 kW solar system, power factor correction and a full LED upgrade. Stage two, three years later: another 70 kW of solar. Stage three: a further 100 kW, the optimal size for the remaining daytime consumption, along with full value for solar exports and a competitive energy rate.

The Results (Estimates)

Solar system 194 kW over three stages (24 kW + 70 kW + 100 kW)
Also included Power factor correction, full LED upgrade, export value and energy rate review
Bill saving 84%
Estimated payback 4.2 years
Estimated ROI 24%

Estimates for the combined three stages and the whole solution, not solar alone.

Commercial Solar Incentives Now

STCs Now Cover Systems up to 1 MW

From 1 October 2026, the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, up from 100 kW. Systems in that range now earn STCs instead of relying only on certificates earned over time.

When Claims Open

The Clean Energy Regulator expects applications for systems above 100 kW to open in mid to late November 2026. Eligible systems installed on or after 1 October 2026 can apply once they open. The STC value depends on system size, location and installation date. Source: Clean Energy Regulator.

Tax Treatment

How a solar system is treated for tax depends on your structure and the rules in force when it’s installed. Talk to your accountant before you commit.

For schools: large campuses that were held to 100 kW per system to stay inside the scheme can now size up to 1 MW and still earn STCs.

School Solar Sizes From Real Projects

These are South Australian school projects from Energy Buster and our sister company Sustainable Savings, which shares the same engineering team. They show the range of system sizes, not fixed packages.

Project Business System Est. payback
Christian college College 100 kW Not published
St Paul’s College, Gilles Plains Boys’ college with trade training centre 194 kW over three stages, plus power factor correction and LED 4.2 years

Paybacks are the published estimates for each whole project. Your payback depends on term-time load, export arrangements, tariff, roof and the equipment selected. For a sizing reference, see our 100 kW system page. For projects across other industries, see our commercial solar work across Adelaide.

Design, Approvals and Installation

Roof and Structure

We check roof sheeting, purlins, fixings, corrosion and shading. On large or older roofs, a structural engineer confirms the load before the design is final.

Three-Phase Supply and Switchboard

Commercial systems connect to three-phase supply at the main switchboard. We check its capacity, protection and space for new equipment, and include any upgrade in the proposal.

Network Connection and Export Limits

Systems above 30 kVA on a low-voltage connection must meet SA Power Networks’ TS132 technical standard and go through its approval process. Export limits may apply, and we design around them.

Installing Without Stopping Work

Rooftop work happens while the site operates. The switchboard connection needs a short planned shutdown, which we schedule around your operating hours.

Battery Option

Where evening load, export limits or backup needs make storage worth considering, we model a battery separately so you can see whether it pays its way.

Monitoring

Every system is handed over with monitoring, so you can compare generation and site consumption and spot a fault early.

For schools: tell us about term dates, out-of-hours use such as OSHC, sport and community hire, and any building works planned. We schedule switchboard shutdowns for weekends or holidays.

Why Choose Energy Buster Panels

Supply Chain You Can Check

Every proposal names the exact panel and inverter models, so your procurement team can check where they come from. We also publish our Modern Day Slavery Statement.

One Set of Warranty Terms

SunPower MAX panels carry a 30-year warranty. The terms are set out in writing in your proposal, so you know what’s covered before you sign. Compare our full solar panel range.

Data Sheets Up Front

Manufacturer data sheets and warranty documents for the panels, inverters and mounting systems we use are on our data sheets page, ready for your engineers and insurers.

Modern Slavery Reporting

Businesses with annual consolidated revenue of $100 million or more must report on modern slavery risks in their supply chains under the Modern Slavery Act 2018 (Cth). Named, documented equipment makes that reporting easier for larger organisations and their customers.

From Bill Review to Switch-On

1. Bill and Data Review

We review your bills and, where available, interval data from your meter.

2. Site Assessment

Roof, structure, shading, access and switchboard inspection.

3. Design and Proposal

System layout, equipment, savings modelling and a written proposal.

4. Network Approval

Connection application to SA Power Networks.

5. Equipment and Scheduling

Equipment ordered, and installation dates set around your operations.

6. Installation

Mounting, panels, inverters and cabling while the site keeps operating.

7. Connection and Commissioning

Planned switchboard shutdown, testing and switch-on.

8. Handover and STCs

Monitoring set-up, documentation and STC paperwork.

Ways to Pay for Commercial Solar

How you pay for a system changes who owns it, how it’s treated for tax and how quickly you see the saving. The common options are:

Upfront Purchase

You own the system from day one and keep all of the savings. The full cost is paid at installation.

Loan or Equipment Finance

Repayments spread the cost over a set term, and the bill savings can offset them. You own the system.

Solar Lease

A provider owns the system and you pay a regular fee to use it. What happens at the end of the term varies by agreement.

Power Purchase Agreement

A provider installs and owns the system and sells you the power at an agreed rate. PPAs usually suit larger sites and longer terms.

Each option has different tax, ownership and cash-flow implications. Talk to your accountant or financier about what suits your organisation.

More School Proof

Why Staging Worked at St Paul’s

Each stage at St Paul’s was sized to the daytime load left after the previous one. The first stage paired solar with LED lighting and power factor correction to cut consumption, and the final 100 kW stage was matched to the remaining daytime use. Because each stage stood on its own payback, the college could fund it from separate budget years.

Community Organisations

Schools share a lot with churches and community organisations: buildings used on set days, tight budgets, staged projects and hall hire. See how we approach solar for community sites.

Read independent customer reviews of Energy Buster on SolarQuotes, or browse all case studies.

Solar for other industries: church and community solar · medical centre solar · all commercial solar in Adelaide

School Solar FAQs

Most of it is exported to the grid, often at a lower value than the power you buy. That is why we size systems to term-time daytime load and look at getting full value for exports. Out-of-hours use such as OSHC, holiday programs and community hire also helps use more of it.

Yes. St Paul’s College in Gilles Plains installed 24 kW first, with LED lighting and power factor correction, then added 70 kW three years later and a further 100 kW in a third stage. Each stage was sized to the remaining daytime load.

It depends on the campus’s term-time daytime load and usable roof area. School projects range from around 100 kW to 194 kW across St Paul’s three stages. We size from your bills and interval data where available.

Yes. From 1 October 2026 the Small-scale Renewable Energy Scheme covers eligible solar systems up to 1 MW, so systems up to 1 MW now earn STCs. The Clean Energy Regulator expects applications for these larger systems to open in mid to late November 2026.

Yes. Rooftop work can be scheduled around the timetable, with access kept away from students. Switchboard connections need a short planned shutdown, which we schedule for weekends or school holidays.

It is worth doing them together. At St Paul’s, the first stage combined solar with a full LED upgrade and power factor correction, which reduced consumption before the larger solar stages were sized.

Yes. Every system comes with monitoring, so students can see generation and consumption data, which suits science, maths and sustainability lessons.

Send Us a Quarterly Bill for a School Bill Check

Send us a recent quarterly bill and we’ll look at the parts that matter for a school:

  • How much of your power is used during term-time school hours
  • How much is exported during holidays, and at what value
  • Which upgrades pay back fastest, so you can stage them
  • A solar size range matched to your campus

Prefer to talk? Call (08) 7120 6377.